Get a quote
Room with taped drywall joints, covered floor and a bucket of compound

Planning your North York renovation

Send MRG the rooms, retained finishes and building details for a North York renovation, then agree the work, materials and timing in writing.

Start with the whole room list

Name every room that needs work and describe what should remain.

Rough dimensions and the address help us understand the job, while building instructions identify access and approval questions.

This form accepts a written description, and you can mention any photos or drawings available for the follow-up.

Tell us if you will be living in the home and which kitchen or bathroom needs to remain usable.

How the scope comes together

  1. Describe the rooms

    List the work room by room and identify any proposed layout or plumbing changes so the request includes more than the visible finishes.

  2. Check the home and access

    The room condition, measurements and route for materials are checked before a firm scope is agreed, with building rules included for condo work.

  3. Agree the written scope

    The scope records what stays, what is replaced, who supplies the materials and the work at the connections between rooms.

  4. Set the sequence and timing

    The schedule follows the agreed work, material availability and building hours, including drying time and the rooms that must stay usable.

  5. Record changes and finish the work

    Extra work is agreed in writing before it proceeds, and unit work ends with a walkthrough and a list of anything left to correct.

Orders and decisions already made

Tell us about cabinets, floor products or fixtures you have bought, along with their dimensions and delivery dates.

The scope needs to say who supplies each item and whether any parts are still missing.

If a wall is moving or the sink location is changing, include the approval status with the room list.

A schedule cannot be settled from a desired move-in date alone when the work and material deliveries are still undecided.

Questions about planning your north york renovation

How does a connected-room renovation request begin?

Name every room that needs work and describe what should remain.

Rough dimensions and the address help us understand the job, while building instructions identify access and approval questions.

This form accepts a written description, and you can mention any photos or drawings available for the follow-up.

How are retained surfaces put into the renovation agreement?

List the work room by room and identify any proposed layout or plumbing changes so the request includes more than the visible finishes.

The room condition, measurements and route for materials are checked before a firm scope is agreed, with building rules included for condo work.

The scope records what stays, what is replaced, who supplies the materials and the work at the connections between rooms.

What should be disclosed about products already ordered?

Tell us about cabinets, floor products or fixtures you have bought, along with their dimensions and delivery dates.

The scope needs to say who supplies each item and whether any parts are still missing.

If a wall is moving or the sink location is changing, include the approval status with the room list.

Tell us which rooms are changing

Send the room list, the address and what you want to keep for a written renovation scope.

Get a quote
Get a quoteCall